Remarks: Final heights of 801 meters, with a speed of 120m/minute and with 3.2 ton lifting capacity
![](https://www.nftcrane.com/sites/default/files/bk.png)
![](https://www.nftcrane.com/sites/default/files/Jeddah%20Power%20Plant.png)
Power Plant in Jeddah
Country: Saudi Arabia
Number of cranes supplied: 9
Type: Hammerhead
Crane models include: MD 1100, MC 310 K 16
![](https://www.nftcrane.com/sites/default/files/Masder%20City_Brookfield%20Multiplex_MD%20365_0.png)
Masdar City - Residence
Country: UAE
Number of cranes supplied: 8
Type: Hammerhead
Crane models include: MC 115, MC 205B, MC 235B, MC 310 K12, MC 475 M25
![](https://www.nftcrane.com/sites/default/files/Notre%20Dame%20University.png)
Notre Dame University
Country: Lebanon
Number of cranes supplied: 2
Type: Hammerhead
Crane models include: 764, 428
![](https://www.nftcrane.com/sites/default/files/Northwest-Cambridge_0.jpg)
The North West Cambridge Development
Country: United Kingdom
Number of cranes supplied: 4
Type: Flat Top, Hammerhead
Crane models include: MD 345 L 12, MDT 218A J10, MDT 218A J8
![](https://www.nftcrane.com/sites/default/files/Birmingham.jpg)
Birmingham’s tallest office
Country: United Kingdom
Number of cranes supplied: 1
Type: Flat Top
Crane models include: MDT368 L16
Remarks: Floor-by-floor dismantling of the concrete tower, which will take around 12 months. After demolition is done commencement of Birmingham’s tallest office tower at 103 Colmore Row Site.